Continuing investigation on flood control projects across the country are unraveling more anomalous implementation of the said projects as at least 52 projects in several barangays in Malolos, Bulacan were considered nonexistent or ‘ghost’ projects as they could not be located

Based on the findings of the Malolos City People’s Audit Team (MCPAT), out of the 106 projects they inspected, only 54 were either completed (27) or ongoing (27) while the rest were either found to have substandard materials, incomplete or with a reduced project scope.

The anomalous flood control projects were implemented in 30 of 51 barangays in this city by the Bulacan First Engineering District of the Department of Public Works and Highways (DPWH) from 2022 up to this year, according to an audit conducted by local officials and residents.

Malolos mayor Christian ‘Agila’ Natividad, who lead the MCPAT inspection, disclosed that his team have already submitted their findings to the Independent Commission for Infrastructure (ICI). Their inspection yielded a 1,800-page ‘Summary of Flood Control Projects Inspection Report’ compiled from the descriptions, narratives and photos of all 106 flood control projects in the city.

Natividad created the MCPAT through Executive Order No. 39 last August 29 and is composed of the legal and engineering heads of the Malolos City local government, along with over 1,000 volunteers, including business leaders, professionals, residents and even law enforcement units. 

The team’s report showed that among the contractors for the projects inspected were Wawao Builders and SYMS Construction, which had been blacklisted by public works secretary Vivencio ‘Vince’ Dizon for their involvement in anomalous flood control structures, mostly in Bulacan.

Natividad cited that one of the things that stood out in their audit involved the small coastal barangay of Calero, where despite having only 100 households, had 13 flood control projects in the area with a combined cost of ₱1.4 billion.

According to the mayor, he ordered all suspected ghost and incomplete projects to be declared ‘crime scenes’ as he also directed all village officials to ban all construction activities which would just be attempts to cover up suspected anomalies.

“We are expecting that after this, all those behind the projects will face the necessary charges and that this becomes a precedent so that no similar offenses, crime or violations will be committed again. The findings of the people of Malolos through our MCPAT can serve as sworn affidavits in filing the necessary charges as Justice Andres Reyes of the ICI informed us,” he pointed out. 