DOE prepares rules for first nuclear power tender, targets 1,200 MW by 2032

MANILA – The Department of Energy (DOE) is advancing proposed rules for the Philippines’ first competitive nuclear power capacity tender as the government prepares for the planned entry of nuclear energy into the country’s power mix.

Under the Philippine Energy Plan, the government is targeting an initial 1,200 megawatts (MW) of nuclear power capacity by 2032, increasing to 2,400 MW by 2035 and 4,800 MW by 2050.

The proposed tender framework covers requirements on grid readiness, project delivery schedules, regulatory approvals and pricing. Preliminary grid feasibility may also be considered in determining the amount of nuclear capacity offered in each bidding round.

The DOE said procurement could be conducted in stages, taking into account site development, nuclear technology, financing, licensing requirements and the readiness of the country’s transmission network.

Winning a tender would not automatically authorize a developer to build or operate a nuclear facility. Projects would still need to secure the required licenses and approvals from the Philippine Atomic Energy Regulatory Authority and other government agencies.

The Energy Regulatory Commission would also determine the applicable price ceiling, reserve price, tariff range or pricing methodology for each tender round.

The proposed rules remain subject to finalization following stakeholder consultations.

Leave a Reply