P97-M flood control projects set for CDO until 2026

Image of a completed flood control structure in Barangay Balulang, Cagayan de Oro City, highlighting the concrete wall and surrounding area.

One of the finished flood control projects in Cagayan de Oro City in 2024. Cagayan de Oro 1st District Rep. Lordan Suan said Friday (July 25, 2025) that at least PHP97 million will be allocated for the city’s flood control projects over the next year. (Photo courtesy of Cagayan de Oro 1st District Rep. Lordan Suan)

CAGAYAN DE ORO CITY – At least PHP97 million will be allocated for the city’s flood control projects over the next year.

In an interview Friday, 1st District Rep. Lordan Suan said this allocation is part of the PHP1.594 billion earmarked for the Department of Public Works and Highways (DPWH) 10 (Northern Mindanao) and its 1st District Engineering Office for this year until 2026.

“These projects are based on lessons from past disasters, particularly Typhoon Sendong (international name Washi), and aim to mitigate flood risks in vulnerable areas,” he said.

DPWH-10 1st District Engineer Anna Lee Manzano confirmed that most of the projects for 2025 include flood mitigation. She said the design of the flood mitigation structures takes into account the flood heights recorded during the onslaught of Sendong.

“We considered the flood levels back then and adjusted the design accordingly. But with climate change, anything can happen. So we just hope and pray that the impact won’t be as devastating,” she said.

Aside from flood control, other infrastructure initiatives planned for 2025 include drainage systems, roadway lighting, multipurpose buildings, access roads and asphalt overlays. (PNA)

Leave a Reply

Discover more from

Subscribe now to keep reading and get access to the full archive.

Continue reading