Gov’t to implement P351-B flood control master plan

BBM Vlog on Feb. 1, 2026. Screen grabbed from Pres. Bongbong Marcos Jr’s video/Facebook.

Recognizing the need to administer long-term solutions to solve the massive flooding experienced by the country, the Marcos Jr. administration is eyeing to implement a P351 billion Flood Management Master Plan that would hopefully address the perennial problem.


Last week, President Ferdinand ‘Bongbong’ Marcos Jr. visited several towns in Central Luzon to personally see the extent of damage wrought by the recent storms and heavy rains caused by the intensified southwest monsoon or habagat.

The president witnessed at first-hand the effects of the extensive flooding in Bulacan, Tarlac, Pampanga and other areas caused by extreme weather conditions. 

During the inspections, he confirmed that a master plan already exists and his administration will immediately execute it.

“We already have a master plan. It’s just never been executed. We’re only executing it now,” he enthused while citing that previous administrations failed to implement the master plan.

The chief executive did not elaborate as to why the plan was not pursued but he reiterated that they are already reviewing the so-called Aquino-Singson Master Plan that was approved in 2012 by then President Benigno Simeon ‘Noynoy’ Aquino III and erstwhile Department of Public Works and Highways (DPWH) secretary Rogelio Singson.

Accordingly, the DPWH is moving to update flood management master plans across the country as part of efforts to strengthen long-term flood resilience. 

Public Works chief Vivencio ‘Vince’ Dizon disclosed that measures to mitigate the flooding problem are on the table in line with the president’s expressed instruction to improve the country’s flood resilience.

He added, though, that the flood master plans must thoroughly studied and improved as there are those in many areas that are either outdated or incomplete, making their updating necessary in light of changing climate conditions.

“These master plans are important because they guide the engineering design of flood mitigation infrastructure. To effectively update the plans, (we) are working with the University of the Philippines–Project Nationwide Operational Assessment of Hazards (UP-NOAH), local government units (LGUs) and other government agencies to incorporate current hazard maps and scientific data,” Dizon pointed out. 

Specifically, he said that the DPWH is prioritizing the updating of the flood control master plans for major river basins all over the country.

Leave a Reply

Discover more from

Subscribe now to keep reading and get access to the full archive.

Continue reading